Project complexities, simplified by Alpha:
- Constructing within an operational Nestlé production facility, requiring careful sequencing and logistics planning to maintain safe access and uninterrupted manufacturing operations.
- Meeting a highly accelerated programme with client access required at 26 weeks, requiring programme optimisation and coordination of construction activities and long-lead, internationally sourced materials.
- Delivering high-tolerance flooring and specialist cladding systems, requiring precise workmanship and coordination to meet performance requirements for automated production environments.
Scope of Works:
- Construction of a steel-framed production facility, providing a robust structure suitable for high-load manufacturing operations.
- Installation of a high-tolerance reinforced concrete floor slab, incorporating fibre reinforcement to enable rapid installation and minimise joints, supporting automated production systems.
- Installation of glazing and specialist cladding systems, including Kalwall translucent cladding to maximise natural light and improve internal working conditions.
- Construction of external infrastructure, including lorry parking, access roads and drainage systems to support site logistics and operations.
- Delivery of landscaping works, including a lake and reed bed, providing sustainable drainage and environmental integration within the site.