Project complexities, simplified by Alpha:
- Working within an operational bottled water plant, requiring strict segregation between construction activities and production areas to maintain hygiene standards and uninterrupted operations.
- Delivering a water treatment facility to regulated standards, incorporating stainless steel drainage, pipework and specialist finishes to meet potable water and hygiene requirements.
- Coordinating works adjacent to existing infrastructure and shared access routes, ensuring safe movement of vehicles and personnel without impacting ongoing site activities.
Scope of Works:
- Excavation and construction of reinforced concrete raft foundations, providing a stable base for both the treatment building and associated infrastructure.
- Installation of integrated stainless steel drainage channels, ensuring hygienic, corrosion-resistant drainage suitable for water treatment operations.
- Construction of a cold-rolled steel frame building with insulated cladding, delivering a durable and controlled environment for treatment processes.
- Internal blockwork partitions and roller shutter doors, creating functional and secure operational zones within the facility.
- Construction of a separate reinforced concrete foundation for water storage tanks, supporting critical treatment infrastructure.
- Installation of stainless steel pipework connecting existing boreholes to the treatment facility, enabling efficient and compliant water transfer.
- Application of specialist floor coatings to DWR standards, ensuring compliance with hygiene and durability requirements in a potable water environment.