Project complexities, simplified by Alpha:
- Undertaking works within a live production facility, requiring careful sequencing and protective measures to ensure uninterrupted manufacturing operations.
- Managing the safe removal of notifiable asbestos materials, requiring controlled environments, specialist procedures and full regulatory compliance.
- Working above operational packaging lines, necessitating extensive internal scaffolding and encapsulation to protect equipment and personnel.
- Operating within restricted access conditions, requiring careful logistics planning and coordination to maintain programme certainty.
Scope of Works:
- Full removal of the existing roof system, including safe dismantling of external roofing materials.
- Controlled removal of notifiable asbestos insulation boards and sheeting, undertaken in accordance with strict safety and compliance requirements.
- Installation of a new composite insulated cladding panel roof system, improving thermal performance and extending the building’s lifespan.
- Installation of extensive internal scaffolding and encapsulation systems, protecting live production lines and personnel during overhead works.
- Delivery of works within a live manufacturing environment, maintaining full operational continuity throughout the project.







