Construction of a new 132kV substation

Client : Siemens Transmission and Distribution Ltd

End User : Northern Power Grid

Location : West Yorkshire

Contract Value : £863,000

Project complexities, simplified by Alpha:

  1. Significant site level raising, requiring engineered fill and specialist Rolling Dynamic Compaction (RDC) techniques to achieve the required ground bearing capacity for high-voltage infrastructure. This ensured the long-term stability of transformer and switchgear foundations, reducing settlement risk and protecting asset performance.
  2. Integration of civil, structural and M&E elements, ensuring seamless coordination between substation foundations, control building construction and electrical installation works. Careful sequencing and interface management were essential to prevent clashes, rework and programme disruption.
  3. Delivery of critical grid infrastructure, where ground performance and construction accuracy were fundamental to long-term operational reliability. Build precision directly influenced the safety, durability and resilience of the 132kV connection.

Scope of Works:

  • Bulk earthworks and engineered fill, raising site levels to enable construction of HV substation foundations. This created a stable, compliant platform capable of supporting heavy electrical equipment.
  • Application of specialist Rolling Dynamic Compaction (RDC) techniques, improving ground bearing capacity to meet structural and equipment load requirements. RDC enhanced ground performance efficiently, avoiding more invasive and costly foundation solutions.
  • Construction of reinforced concrete foundations, cable troughs and ducting, supporting high-voltage transformers and associated infrastructure. These elements formed the structural and service backbone of the substation.
  • Construction of a new brick-and-tile Control Building, including full M&E design and installation, internal finishes and drainage systems (cess tank and soakaway), providing a secure, fully serviced operational hub for switchgear control and monitoring.
  • Installation of electrified palisade fencing and concrete fence beams, delivering compliant perimeter security for critical energy infrastructure.
  • External infrastructure works, including drainage, tarmac access roads and site finishes, ensuring safe access, effective water management and long-term site durability.

Ready to Build with Confidence?

Let’s shape a smarter, safer, more efficient solution, together.

Related Case Studies

Padiham

Padiham

Design & construction of a new GIS Substation.

View Case Study
Burwell

Burwell

Substation extension & upgrade

View Case Study
Blyth

Blyth

Construction of a new high voltage substation

View Case Study
Wymondley

Wymondley

Construction of a GIS building & transformer infrastructure within a live substation

View Case Study
Norwich Main

Norwich Main

Construction of foundation & cable infrastructure for a 400kV AIS substation

View Case Study
Alpha Construction Ltd

Why Alpha Construction Ltd?

We support clients from the earliest stages of a project to help shape practical, buildable solutions before work starts on site.

Adding Value Early

Adding Value Early

Early Contractor Involvement allows us to contribute our delivery experience during the design and planning stages, helping test options against real site conditions and reduce the risk of later change

Trusted Delivery Teams

Trusted Delivery Teams

Our directly employed teams provide continuity, accountability and practical site experience throughout delivery, supporting consistent standards of safety, quality and programme management.

Proven in High-Risk Environments

We regularly deliver projects in live, complex and highly regulated environments where safety, planning and coordination are critical. This experience allows us to manage risk effectively and maintain control of programme and quality, even when conditions are challenging.

Framework & Public Sector Ready

Our processes and reporting are aligned with framework and public sector requirements, supporting strong governance, transparency and compliant delivery throughout the life of a project.

Transparent, Competitive Pricing

Transparent, Competitive Pricing

We provide clear, considered pricing supported by open communication around scope, risk and delivery requirements. This helps clients make informed decisions and maintain greater visibility over costs throughout the project.

Relationship-Driven Delivery

Relationship-Driven Delivery

We work collaboratively with clients, designers and stakeholders to build long-term working relationships based on trust, communication and consistent delivery. This results in smoother projects, quicker resolution of issues, and stronger outcomes over time.

Ready to Build with Confidence?

Let’s shape a smarter, safer, more efficient solution, together.