Qila Energy – Anaerobic Digester Plant, Towcester

For: Qila Energy

Client / End User: Qila Energy Manor Farm AD Ltd.

Services Provided: Civil engineering construction

Scope: All civil engineering works associated with the construction of a new Anaerobic Digestion (Gas to Grid) Plant.

  • All site preparation bulk excavation and filling works.
  • Construction of Precast concrete retaining walls to form large feedstock storage area or ‘clamp’.
  • Construction of reinforced concrete foundation bases for 2no sludge digester and 1no buffer tank.
  • Construction, excavation and specialist rubber membrane lining of a 5000m3 process water lagoon.
  • Foundations for ancillary structures, compressor plant and pumps.
  • Access roads path and site surface finishes.
  • All coordinated and completed within a operational arable farm.
Qila Energy - Anaerobic Digester Plant, Towcester
Qila Energy - Anaerobic Digester Plant, Towcester