Envar Limited – Composting Structure, Huntingdon
For: Envar Limited
Client / End User: Envar Limited
Services Provided: Site investigation, Design, Construction (civils and building works)
Scope: Design and construct a five number tunnel in vessel composting facility capable of processing in excess of 60Kton of green waste per year. Including construction of a new biofilter system.
Works consisted of groundworks, reinforced concrete foundations including structural Insitu 6m high concrete walls, Drainage works, M&E installation, structural steel and cladding works.
Unusual aspects
- Liaising with specialist equipment supplier based in the Netherlands