Project Complexities, simplified by Alpha:
- Executing full civil delivery within an agricultural environment, requiring careful logistics planning, ground management and phased sequencing to maintain programme momentum while protecting surrounding land use.
- Integrating surface water and leachate management systems across the plant footprint, ensuring environmental containment and regulatory compliance for waste and process liquids.
- Coordinating structural base construction and underground service infrastructure with process plant installation, protecting commissioning timelines and avoiding abortive works.
Scope of Works:
- Bulk earthworks and site preparation, including clearance and excavation for hard standings, tank locations, process buildings and ancillary structures.
- Construction of hard paved feedstock storage clamp areas, access roads and circulation routes, providing durable operational surfaces for heavy vehicle movement.
- Construction of reinforced concrete plinth bases, engineered to support digester tanks and associated process plant loading.
- Installation of precast and cast in-situ concrete clamp walls, forming secure and load-bearing feedstock containment structures.
- Installation of surface water and leachate collection pipework systems, including chambers and associated drainage infrastructure.
- Installation of underground cable ducts and chambers, supporting on-site power distribution and control systems.




