Project complexities, simplified by Alpha:
- Constructing pumping stations across both urban and rural environments, requiring adaptable construction approaches and careful logistics planning to suit differing site constraints.
- Implementing temporary earthwork support systems, enabling safe excavation and construction of reinforced concrete structures in varying ground conditions.
- Working around existing statutory services, requiring detailed planning and coordination to avoid disruption and ensure safe integration.
- Integrating new pumping infrastructure with existing gravity drainage systems, ensuring reliable operation during flood events and improved site resilience.
Scope of Works:
- Construction of two reinforced concrete pumping station structures, located across both rural and urban environments to support flood alleviation.
- Installation of collection chambers and weir structures, enabling controlled diversion of stormwater from the existing gravity sewer system during flood events.
- Installation of uPVC inlet pipework and ductile iron outlet pipelines, ensuring efficient transfer of stormwater to the receiving system.
- Construction of reinforced concrete outfall structures, providing controlled discharge and integration with the surrounding environment.
- Construction of MCC foundations and kiosks, supporting power supply, pump control and instrumentation monitoring systems.
- Installation of ducting and associated infrastructure, enabling integration of electrical and control systems.
- Delivery of external works, completing the operational requirements of the pumping stations.