Project complexities, simplified by Alpha:
- Undertaking the role of Principal Contractor across the full project scope, including civils, structural, mechanical, electrical and plant installation, ensuring compliance with UK CDM regulations for an international client.
- Coordinating a multi-discipline construction programme, integrating civil works, building construction and specialist plant installation within a single delivery framework.
- Sequencing construction around installation of the boiler plant, including constructing the building around installed equipment to reduce lifting complexity and programme risk.
- Managing international client interfaces, ensuring clear communication and alignment with UK construction standards and delivery expectations.
Scope of Works:
- Design and construction of the biomass energy facility building, delivering a fully integrated structure to accommodate energy-from-waste operations.
- Construction of a 3m deep reinforced concrete pit structure, designed to house the main boiler plant and support heavy process equipment.
- Installation of all foundations, floor slabs and building superstructure, providing a durable and robust industrial facility.
- Installation of mechanical, electrical and ventilation systems, supporting plant operation and environmental control.
- Construction of external infrastructure, including cross-country water main installation and Western Power substation building.
- Refurbishment of existing site buildings, integrating new and existing infrastructure into a cohesive operational site.