Project complexities, simplified by Alpha:
- Constructing on a greenfield site directly adjacent to a live food production facility, requiring controlled site management and sequencing to protect ongoing dairy operations and maintain biosecurity considerations.
- Delivering the complete civil engineering package within an 11-week programme, requiring disciplined planning and coordination to align with plant installation and commissioning milestones.
- Supporting the first Defra part-funded anaerobic digestion scheme, where programme certainty and delivery reliability were critical to demonstrating viability for future nationwide rollout.
Scope of Works:
- Construction of reinforced concrete tank bases and equipment plinths, engineered to support process plant associated with anaerobic digestion.
- Installation of site-wide drainage systems, ensuring compliant surface water and process water management.
- Construction of concrete slabs and operational hard standings, forming durable surfaces for plant operation and vehicle movement.
- Formation of new access road infrastructure, enabling safe and controlled site access.
- Installation of perimeter fencing, securing the new energy facility adjacent to existing food processing operations.